Tunnel 9 Pitch Upgrade
- Notice type
- Solicitation
- Product or service code
- 4320 · POWER AND HAND PUMPS
- Set-aside
- Total small business
- Place of performance
- MarylandSilver Spring, MD
- Official notice
- View on SAM.gov ↗
Description
The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include:
• Primary control valve (step response time of 55 ms or less)
• Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s)
• Hydraulic Power Unit (HPU)
• Dedicated filtration and cooling "kidney" loop.
The rest of this notice
The buyer's named contact and the award details for this notice are free. Create an account to open the full record.
- Contact the buyer directly
- See who won, and for how much
- Get alerts for opportunities like this one
Free — no card, no trial clock.
