LAANG HANGAR 5 FIRE SYSTEMS REPAIR NAS JRB NEW ORLEANS, LA
Description
LAANG Hangar 5 Fire System Repairs (Current Mission): upgrades/replacement of the fire protection systems to in the hangar bay to comply with the Department of the Air Force Sundown Policy for Foam Fire Suppression Systems memorandums dated 16 November 2021 (AF Tab1), 18 January 2022 (AF Tab2), and Fire Suppression Design Change Instruction and Code Criteria Update, Naval Air Station Joint Reserve Base, RQLH142018, Repair Maintenance Hangar, B5. LAANG Hangar 5 is categorized as a Tier 2 Facility. Project includes demolition of the existing low-level fire suppression system in the hangar bay(previously AFFF system), demolition of the overhead wet-pipe sprinkler systems in the hangar bay(previously AFFF), installation of new wet-pipe fire sprinkler system(s) and detection system in the hangar bay, replacement of the fire alarm system throughout the entire building with a new fire alarm/mass notification system (MNS), addition of aircraft power service points, repurposing of existing space as a battery shop, and related repairs/upgrades.
The rest of this notice
The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Get alerts for tenders like this one
Free — no card, no trial clock.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.