Amendment 36C24627Q0113 (P00003) Window Fabric Treatment Questions (Black) / Response (Red)

1. Scope and Quantities The window schedule identifies 96 windows across Pods A, B, C, and D. Amendment 0001 states that the valances will also need fabric. Could the Government confirm whether the 96 scheduled windows represent the complete quantity, and whether valance fabric is included in these quantities or should be priced separately?

Response: Valance fabric was included as a full unit to the window. 96 windows = 96 valences.

2. Existing WebbLok Hardware Amendment 0001 indicates that existing WebbLok tracks, brackets, tubes, operators, and valances appear to be in place, except for one missing track in Room S136 Recreation. Could the Government confirm which existing hardware components are expected to be reused and whether the contractor is responsible for replacing the missing track?

Response: S136 is not part of this contract.

3. Site Access and Measurements Is there an opportunity for prospective quoters or their proposed installation partners to conduct a pre-award site visit and field measurements? If not, could the Government confirm whether measurements and verification will be permitted immediately after award and before materials are ordered?

Response: The measurements is provided in the original solicitation. Government confirms that they will be able to measure prior to ordering as that is listed in the SOW.

4. Installation Phasing and Schedule Could the Government provide an anticipated installation timeframe or expected sequence for Pods A, B, C, and D? Are there any anticipated restrictions on the number of Pods or rooms that may be worked on simultaneously?

Response: Installation timeframe is dependent upon the lead time of the fabric offered. Restrictions would include working past 5PM in occupied pods, however, the VA asks to complete rooms all the way through to ensure complete activation (ie: no removing all the blind fabrics and not being able to put it back up by end of day.)

5. Project Experience Requirements The solicitation requires at least five years of healthcare interior design/furniture installation and project management experience, as well as three Federal projects valued at $750,000 or more. Could the Government clarify whether the experience and past-performance qualifications of a proposed subcontractor or installation partner may be considered in satisfying these requirements when the prime contractor is responsible for project management and contract administration?

Response: That will qualify.

6. Past Performance Could the Government clarify whether the three Federal projects referenced in the experience requirement must each be valued at $750,000 or more, and whether projects involving window treatment installation or similar healthcare facility interior installations may qualify?

Response: Must be valued at $750,000 and similar facility installations qualify.

7. Pricing and Installation The price schedule separates material and installation services by Pod. Could the Government confirm whether installation pricing should include removal and disposal of existing shade fabric, fabric installation on valances, field measurements, project management, training of VA maintenance personnel, cleanup, and punch-list trips Response: Correct, pricing should include installation, measurements, project management, clean-up, and punch list.

8. Product Specification Is the specified Inpro WT Commercial Shade Fabric 25X, 251-10 the required product, or may a technically equivalent product meeting all specified characteristics be offered? If an equivalent product is proposed, could the Government confirm the sample submission process and whether the sample deadline is calculated from the original quotation deadline or the date of actual quote submission?

Response: This is addressed in the submission. It is an or equal contract.

The rest of this notice

The buyer's named contact and the award details for this notice are free. Create an account to open the full record.

  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for opportunities like this one
Create a free account

Free — no card, no trial clock.

Get new Blind and Shade Manufacturing contracts by email — free, no card needed.
Create a free alert