Back to search
SAM.govRef 47PD5526R0042

MT0055AW, 34406, Roof and Building Envelope Modernization, Turner LPOE - Amendment 0002

PPUBLIC BUILDINGS SERVICE logo
Contracting officePublic Buildings Service
ClosedConstructionNAICS 236220
Submission deadlineSep 22, 202605:30 PM EDTClosed
PublishedOct 6, 2026
LocationTurner, MT
Notice type
Combined Synopsis/Solicitation
Product or service code
Z2AA · REPAIR OR ALTERATION OF OFFICE BUILDINGS
Set-aside
Total small business
Place of performance
MontanaTurner, MT
Official notice
View on SAM.gov ↗

Description

Amendment 0002 is to provide responses to RFIs. This has also extended the offers due date to 10/22/2026 @ 4:30PM MT. All offers should be submitted electronically to [email protected] The following documents are included: - joint sealants -2024-07-26_GSA Turner_100% CD Project Manual -CRCI Updated Turner Roof Inspection Report 6.3.2022 -RFIs and responses The U.S. General Services Administration intends to solicit construction services for the Turner Roof & Building Envelope Project at the Turner Land Port of Entry, 41725 Turner Road, Turner, Montana 59542, Building No. MT0055AW. The project includes roof replacement and building envelope improvements at the main building, including work on the U.S. and Canadian sides of the facility, and envelope improvements at the water treatment building. Work includes, but is not limited to, selective demolition, roof replacement, exterior wall/cladding repairs, thermal and moisture protection, metals, openings, finishes, and incidental electrical, communications, and security-related coordination. The facility will remain occupied and operational during construction. The contractor must phase and secure the work daily, maintain safe access, protect ongoing border operations, and coordinate with GSA, CBP, CBSA, and other stakeholders regarding antennas, cameras, cables, signs, access, security, and inspections. Work affecting the Canadian side may require Canadian access, work permit, and material import coordination. Certain roofing materials may be furnished through the existing roofing warranty process; the contractor will be responsible for coordinating those materials with the manufacturer/certified installer and providing all remaining labor, materials, equipment, supervision, bonds, permits, and incidentals required to complete the work. The contractor shall comply with the solicitation documents, drawings, specifications, applicable codes and standards, GSA PBS Core Building Standards, security and badging requirements, environmental survey requirements, fire/life safety requirements, submittal requirements, and closeout requirements. The anticipated period of performance is 150 calendar days after notice to proceed. The solicitation is expected to include base bid work for the main building roof and envelope on the U.S. side, main building roof and envelope on the Canadian side, and water treatment building envelope work on the U.S. side. An in-person site visit is anticipated. Currently the date is TBD.

The rest of this notice

The buyer's named contact and the award details for this notice are free. Create an account to open the full record.

  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for opportunities like this one
Create a free account

Free — no card, no trial clock.

Get new Commercial and Institutional Building Construction contracts by email — free, no card needed.
Create a free alert