Renovate B203 for C130 J Conversion
Description
This project provides the necessary upgrades to building #203 aircraft engine shop, to maintain the required number of new C130J aircraft engines and propellers to support the YARS mission. The renovations to building 203 include the construction of enclosed areas within the existing workshop, facilitating the ability to maintain and store engines on stands, as well as a room to perform repairs of the J-model propeller blades. These rooms will be temperature and humidity-controlled to meet storage and repair requirements. Reference attachments for Statement of Work and Specifications
The rest of this notice
The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Get alerts for tenders like this one
Free — no card, no trial clock.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.