Back to search
SAM.govRef 36C25027B0006

655-23-101 Site Water Loop Replacement

VVETERANS AFFAIRS, DEPARTMENT OF logo
Contracting officeDepartment of Veterans Affairs
PlanningConstructionNAICS 236220
PublishedNov 4, 2026
LocationSaginaw, MI
Notice type
Presolicitation
Product or service code
Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES
Set-aside
Service-disabled veteran-owned small business
Place of performance
MichiganSaginaw, MI
Official notice
View on SAM.gov ↗

Description

The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well. Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed.

The rest of this notice

The buyer's named contact and the award details for this notice are free. Create an account to open the full record.

  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for opportunities like this one
Create a free account

Free — no card, no trial clock.

Get new Commercial and Institutional Building Construction contracts by email — free, no card needed.
Create a free alert