SAM.govRef 36C24227Q0042

W045--Boiler Rental

VVETERANS AFFAIRS, DEPARTMENT OF logo
Contracting officeDepartment of Veterans Affairs
ClosedServicesNAICS 238220
Submission deadlineOct 21, 202602:00 PM EDTClosed
PublishedOct 20, 2026
LocationMontrose, NY
Notice type
Combined Synopsis/Solicitation
Product or service code
W045 · LEASE OR RENTAL OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
Set-aside
Not specified
Place of performance
New YorkMontrose, NY
Official notice
View on SAM.gov ↗

Description

36C24227Q0042 Mod 2 Answers to questions submitted:

Q1: What is the observed historical peak steam load of the facility?

A1: 120,000 lb./hr.

Q2: Will the Montrose VAMC waive the requirements of the VHA Safety Device and Testing Manual?

A2: No.

Q3: Air permits for emissions are the responsibility of the entity operating/generating the emission, not the owner of the equipment. Please clarify.

A3: VA only, not the vendor.

Q4: Will the VA change the 9PPM NOx requirement to 30 PPM?

A4: No.

Q5: Please clarify the size of the Boiler.

A5: 800 HP Q6: Will fuel for the rental boiler be furnished by the Government of the Contractor?

A6: Government Q7: Confirm intended placement and connection routing if boiler placement is on the south end but connections are at the north end?

A7: East side of the plant (end near Boiler 1 near Building 24 hazmat storage area)

Q8: What is the required installation and ready for service date?

A8: Installation 11/1/2026. Ready for service 12/1/2026. Q9. Is a rental unit rated at about 30ppm NOx on natural gas acceptable for the temporary heating period, given that it is a temporary rental operating under the facility s existing permit? A9. Yes Q10. If 9 ppm NOx is mandatory, will the Government accept a unit fitted with flue gas recirculation (FGR) or selective catalytic reduction (SCR) to meet it, and will any additional time be allowed for delivery? A10. The most important factor is that the vendor make the delivery date, so the 9-ppm cis is not a deal breaker. Q11. The requirement lists a 95 PSIG operating pressure but also references 35,000 lb./hr. at 212° F and a 15 PSIG code. What operating pressure should the rental boiler be size for? A11. 95 PSI is sufficient. Q12. Can a portable day tank with a capacity of 10,000 gallons be placed next to the portable boiler in lieu of installing a return line several hundred feet across to the opposite end of the boiler plant? A12. No. ** Please acknowledge all amendments with your response**

The rest of this notice

The buyer's named contact and the award details for this notice are free. Create an account to open the full record.

  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for opportunities like this one
Create a free account

Free — no card, no trial clock.

Get new Plumbing, Heating, and Air-Conditioning Contractors contracts by email — free, no card needed.
Create a free alert