Back to search
SAM.govRef 69056726R000020

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

FFEDERAL HIGHWAY ADMINISTRATION logo
Contracting officeFederal Highway Administration
PlanningConstructionNAICS 237310
PublishedOct 5, 2026
LocationYellowstone National Park, WY
Notice type
Presolicitation
Product or service code
Y1LB · CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Set-aside
Not specified
Place of performance
WyomingYellowstone National Park, WY
Official notice
View on SAM.gov ↗

Description

Update 10/5/2026: QA_10-05-2026.pdf posted to attachments.

PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 LOCATION: 0.4 miles SW of Mammoth, WY WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. See “Project Description” posted under Attachments for additional details.

LENGTH: 0.7 miles and parking lot TENTATIVE COMPLETION DATE: Fall 2028 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 45,000,000 and $55,000,000 .

INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links) This project is anticipated to be solicited Winter 2026/2027 PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

The rest of this notice

The buyer's named contact and the award details for this notice are free. Create an account to open the full record.

  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for opportunities like this one
Create a free account

Free — no card, no trial clock.

Get new Highway, Street, and Bridge Construction contracts by email — free, no card needed.
Create a free alert