Emergency Air Chiller Unit Rental
Description
This was an emergency unusual and compelling urgency request that required an immediate and decisive action. A temporary stopgap measure was needed on the CMOP facility production floor because a faulty facility air-conditioning unit. This action was necessary to protect personnel and products and to ensure the CMOP facility could continue fulfilling its mission of providing veterans with timely, reliable medication. The SW CMOP in Tucson requires temporary supplemental cooling through rental of a 150-ton air-cooled chiller and 140-ton air handler to protect staff and product integrity during elevated heat conditions. This is an Emergency Sole Source acquisition is going to an SDVOSB. The PoP is from 9-10-26 to 10-8-26.
The rest of this notice
The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Get alerts for tenders like this one
Free — no card, no trial clock.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.