Back to search
SAM.govRef W50S8X26BA011

Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGB

DDEPT OF THE ARMY logo
Contracting officeDepartment of the Army
ActiveConstructionNAICS 236220
Closes in 1 day. Submissions due Friday, November 13, 2026 at 03:00 PM EST.
Submission deadlineNov 13, 202603:00 PM EST1 day left
PublishedOct 15, 2026
LocationMoffett Field, CA
Notice type
Solicitation
Product or service code
Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Set-aside
Total small business
Place of performance
CaliforniaMoffett Field, CA
Official notice
View on SAM.gov ↗

Description

The Contractor shall provide non-personal services, to include all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) simulator facility at Moffett Air National Guard Base (ANGB), Mountain View, California. This project will provide an approximately 8,202 gross square foot building consisting of a multi-story, high bay area to house the CRH-OFT simulator, with a single-story area containing CRH mission planning, briefing and debriefing rooms, administrative areas for training and support staff, OFT maintenance and parts storage rooms, secure and non-secure telecommunication rooms, latrine facilities and mechanical, electrical and utility support rooms utilizing conventional design and construction. The building will be of permanent construction with electrical, mechanical, HVAC, plumbing, wet sprinkler fire suppression, fire detection, access control, direct digital control, and utility management. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Air space and insulation to be located inside the cavity wall to meet Energy Code requirements. The primary roofing materials will be standing seam metal roofing to match other installation facilities and the perimeter sloped roof design will include a prefinished standing seam metal roof panel system over rigid insulation. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Main entrance doors will be a pair of anodized aluminum storefront entrance doors with insulating glass including a sidelight. The Mechanical, Electrical, Sim Bay and secondary egress doors will be painted, insulated hollow metal door and frames with controlled access. Antiterrorism/Force Protection elements are incorporated. Supporting facilities include landscaping, utilities, pavements, storm drainage, sanitary sewer, site improvements, communications support, cybersecurity control systems, and tempest security.

The rest of this notice

The buyer's named contact and the award details for this notice are free. Create an account to open the full record.

  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for opportunities like this one
Create a free account

Free — no card, no trial clock.

Get new Commercial and Institutional Building Construction contracts by email — free, no card needed.
Create a free alert