611 CES Wheeler B310 Fire Suppression System Testing
Description
The objective of this contract is to secure certified technical services to troubleshoot the FACP, perform all lapsed ITM cycles, repair identified deficiencies, and fully recertify the system. All inspection, testing, maintenance, and repair of the fire suppression and detection systems shall be performed in strict accordance with DAFMAN 91-203, Chapter 6 (Fire Protection and Life Safety), and UFC 3-601-02 (Fire Protection Systems Inspection, Testing, and Maintenance). The primary fire suppression and alarm systems for Building 310 at Wheeler Air Force Station are currently out of compliance. A recent Fire Department assessment identified that Sprinkler Inspection, Testing, and Maintenance (ITM) has not been accomplished since 2016, and the Fire Alarm Control Panel (FACP) ITM has lapsed and is actively displaying a "trouble" status. Quotes are due by 8:00 AM HST September 24, 2026. Reference the attached documents for Amendment 0001; 1. Performance Work Statement Amendment 0001 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. SF1449 7. SF 30 8. RFQ Amendment 0001 Point of contact: Contracting Specialist: A1C Michael R. Perreira [email protected] 808-789-3167 Contracting Officer: SSgt Thomas Hembree [email protected] 808-789-3170
The rest of this notice
The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Get alerts for tenders like this one
Free — no card, no trial clock.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.