Back to search
SAM.govRef FA251725F0154P00001

B1142 HVAC Repair; Out of Scope Roof Modification

DDEPT OF THE AIR FORCE logo
Contracting officeDepartment of the Air Force
AwardConstructionNAICS 236220
PublishedOct 8, 2026
LocationColorado Springs, CO
Notice type
Justification
Product or service code
Z2AZ · REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Set-aside
Not specified
Place of performance
ColoradoColorado Springs, CO
Official notice
View on SAM.gov ↗

Description

This document approves the award of a modification to a Firm Fixed Price (FFP) Task Order (TO) Under contract FA251720D0004 under the Front Range Multiple Award Construction Contract (FRMACC) Indefinite Delivery Indefinite Quantity (IDIQ). The current TO FA251725F0154 is to provide HVAC work at Building 1142 (Project TDKA 10-1128). The intended action is to modify the current TO and include roof and lighting work for B1142. The justification is to award a modification to aforementioned on-going TO as it is in the interest of efficiency and economy. It is economically sound due to heavy equipment rentals/laborers/etc. that are already scheduled to be on site, alleviating additional mobilization and demobilization costs for a potentially different contractor if competed and awarded other than sole-source. This new requirement for roof replacement, lighting replacement, and interior finishes repair directly overlaps with ongoing work in the facility being performed by the current contractor. The Contractor is familiar with the facility, is in direct control of the construction schedule of HVAC replacement scope already awarded, and can execute the additional scope identified at a lower cost and shorter timeframe than other FRMACC contractors due to the efficiency of de-conflicting overlapping scopes. Positive impacts include assurance of proper sequencing of integrated work to avoid duplication of efforts and costs, elimination of warranty conflicts between contracts, and reduction of mission impact to execute consolidated scope in tandem in lieu of extended, multiple efforts displacing the mission owner on multiple occasions. Examples of overlapping scope with potential for duplicated costs and time include rooftop unit and associated curb placement/detailing on roof, roof-mounted utilities impacted by roof replacement, lighting and interior HVAC rework in tandem with ceiling replacement. Additionally, the roof conditions of this facility are in severe need of repair to mitigate ongoing mission impact in the facility, and are essential to be executed with urgency and without delay related to current awarded HVAC replacement work. This modification was executed by the 21st Contracting Squadron, located at 135 Dover St, Bldg 350, Suite 2225, Peterson Space Force Base, CO 80914. Olgoonik Enterprises, LLC (CAGE: 819A4) received the awarded modification for new work in the amount of $1,355,810.00. The modification was executed on 09/25/2026. Please submit all questions/concerns to the Contracting Officer at [email protected].

The rest of this notice

The buyer's named contact and the award details for this notice are free. Create an account to open the full record.

  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for opportunities like this one
Create a free account

Free — no card, no trial clock.

Get new Commercial and Institutional Building Construction contracts by email — free, no card needed.
Create a free alert